Start at the top. Choose the trusted roofing experts.
On new construction projects, NEDLAW Roofs has considerable experience acting
as a subcontractor or prime contractor, where needed. At all times, however,
we work together with other trades to achieve the common objective: owner satisfaction.
We are authorized applicators of all major roofing systems, including built-up,
modified bitumen, EPDM, TPO and PVC flat-roof systems, as
well as various sloped-roof systems.
We pride ourselves on our ability to meet stringent construction schedules,
even on the most complex, multi-phased and heavily specified jobs. Our portfolio
covers projects with a wide range of specifications and a large geographic area.
| City of Cambridge Civic Centre |
- completed 2007
- 22,500 sq. ft.
- various multi-level roof areas
- torch applied inverted modified roof system with crushed limestone ballast
- extensive custom metal flashings
- winter conditions
- co-ordination with many other trades
- included living roof and Living Wall
- LEED accredited building, points from living roof and Living Wall
|
| TDL Warehouse, Guelph |
- completed 2005
- 155,300 sq. ft.
- warehouse and freezer
- part of the building is over 100 feet tall - susceptible to high winds
- three different roof systems - built up, white EPDM and fully adhered PVC
|
| Go Transit Streetsville |
- completed 2008
- 200,600 sq. ft.
- TPO roof system
- Included 10,200 sq. ft. living roof
- White membrane for energy efficiency
- LEED accredited building
|
| Sisters of St. Josephs, London |
- Completed 2007
- 41,600 sq. ft.
- torch applied modified roof system
- winter conditions
- co-ordination with other trades
- LEED accredited building
- Reflective coating on white modified membrane contributed LEED points
- Included living roof which contributed to LEED points
- Walk out balconies with architectural patio slabs as a walking surface
|
| Bell Mobility, Mississauga |
- Three phases to complete
- roofed phase I in 2001 - 3 buildings - 104,200 sq. ft. inverted hot rubber roof system
- access to roof and hoisting of materials completed with tower cranes/mobile cranes to various roof levels in co-operation with other trades
- roofed phase II in 2003 - 80,400 sq. ft. EPDM roof system
- Installed Living Wall in Phase III in 2008
|